Triple
T31776899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hitachi Construction Machinery |
E811088
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Hitachi Group division |
C57588
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Hitachi Group division Context triple: [Hitachi Construction Machinery, instanceOf, Hitachi Group division]
-
A.
Hitachi business division
chosen
A Hitachi business division is an organizational unit within Hitachi that focuses on a specific market or product area, managing its own strategy, operations, and performance while contributing to the corporation’s overall goals.
-
B.
Kawasaki Heavy Industries division
A Kawasaki Heavy Industries division is an organizational unit within the multinational corporation responsible for managing specific product lines or business areas such as aerospace, rolling stock, shipbuilding, energy systems, or industrial equipment.
-
C.
Bosch division
A Bosch division is a major organizational unit within the Bosch Group that focuses on a specific business area, such as mobility solutions, industrial technology, consumer goods, or energy and building technology, with its own strategy, products, and operations.
-
D.
Fujitsu subsidiary
A Fujitsu subsidiary is a company that is owned or controlled by Fujitsu Limited and operates as part of its broader corporate group, often focusing on specific markets, technologies, or services.
-
E.
Samsung division
A Samsung division is an organizational unit within Samsung Group responsible for managing specific product lines, services, or business functions under the broader corporate strategy.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348e544a48190ab6e700b05f6438c |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:35 p.m.