Triple
T31756199
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Puerto Rico Community Survey |
E810561
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ongoing statistical survey |
C21787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ongoing statistical survey Context triple: [Puerto Rico Community Survey, instanceOf, ongoing statistical survey]
-
A.
national survey
A national survey is a systematic data collection effort conducted across an entire country to gather information about the characteristics, opinions, or behaviors of its population.
-
B.
statistical study
A statistical study is a structured investigation that collects, analyzes, and interprets data to answer specific research questions or test hypotheses using statistical methods.
-
C.
panel survey
chosen
A panel survey is a longitudinal study method that repeatedly collects data from the same group of respondents over multiple time points to track changes and trends.
-
D.
social survey
A social survey is a systematic method of collecting data from a sample of individuals to understand attitudes, behaviors, and characteristics within a population.
-
E.
annual survey
An annual survey is a recurring, once-per-year data collection process used to systematically gather feedback, opinions, or information from a target population for tracking changes over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348e340d48190b780fae618c51464 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:29 p.m.