Triple

T31746779
Position Surface form Disambiguated ID Type / Status
Subject SUPSHIP E810290 entity
Predicate instanceOf P0 FINISHED
Object shipbuilding oversight organization C59390 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: shipbuilding oversight organization
Context triple: [SUPSHIP, instanceOf, shipbuilding oversight organization]
  • A. shipbuilding firm
    A shipbuilding firm is a company that designs, constructs, and sometimes repairs ships and other marine vessels for commercial, military, or private use.
  • B. shipbuilding holding company
    A shipbuilding holding company is a parent corporation that owns and manages multiple shipbuilding and related maritime service subsidiaries, overseeing their strategic direction, finances, and operations.
  • C. shipbuilding facility
    A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
  • D. shipbuilding alliance
    A shipbuilding alliance is a collaborative partnership among shipyards, maritime companies, and related stakeholders formed to jointly design, construct, and support vessels more efficiently and competitively.
  • E. naval design organization
    A naval design organization is an entity responsible for conceiving, developing, and integrating the technical, structural, and systems designs of naval vessels to meet specified operational, safety, and regulatory requirements.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348e233cc819083b6695f70cd75d8 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 11:26 p.m.