Triple

T31744748
Position Surface form Disambiguated ID Type / Status
Subject Dover–Calais E810238 entity
Predicate instanceOf P0 FINISHED
Object cross-Channel route C48167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cross-Channel route
Context triple: [Dover–Calais, instanceOf, cross-Channel route]
  • A. cross-Channel transport infrastructure
    Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
  • B. sea route
    A sea route is a navigable path across seas or oceans used by ships to travel between ports for trade, transport, or exploration.
  • C. Camino de Santiago route
    A Camino de Santiago route is a historically rooted pilgrimage path, composed of interconnected waypoints, infrastructure, and cultural landmarks, that guides travelers from various starting points to the shrine of Saint James in Santiago de Compostela.
  • D. cross-sea bridge
    A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
  • E. ferry crossing chosen
    A ferry crossing is a designated route or location where a ferry transports passengers, vehicles, or goods across a body of water between two points.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348e233cc819083b6695f70cd75d8 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 11:26 p.m.