Triple

T31714346
Position Surface form Disambiguated ID Type / Status
Subject Embarcadero Nuevo Nativitas E809412 entity
Predicate instanceOf P0 FINISHED
Object boat pier C34337 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: boat pier
Context triple: [Embarcadero Nuevo Nativitas, instanceOf, boat pier]
  • A. boatyard
    A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
  • B. fishing pier
    A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
  • C. river pier chosen
    A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
  • D. boat harbour
    A boat harbour is a sheltered body of water equipped with facilities for mooring, servicing, and protecting boats and small ships.
  • E. wharves
    Wharves are structures built along a shoreline or projecting into a body of water where ships can dock to load and unload cargo or passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348df4e048190a4a5a9932ada78d6 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 11:16 p.m.