Triple
T31696165
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ICAO study groups |
E808923
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | temporary body |
C58365
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: temporary body Context triple: [ICAO study groups, instanceOf, temporary body]
-
A.
temporary structure
A temporary structure is a short-term physical construction erected for a limited duration to serve a specific, often transitional, purpose before being removed or replaced.
-
B.
permanent body
A permanent body is a physical entity whose existence and defining properties persist unchanged over time within the modeled domain.
-
C.
temporary city
A temporary city is a short-lived, purpose-built urban environment that provides essential infrastructure, services, and social spaces for a limited time before being dismantled or abandoned.
-
D.
temporary government office
A temporary government office is a short-term administrative entity established by a public authority to perform specific functions or manage particular tasks for a limited duration.
-
E.
temporary currency
A temporary currency is a short-lived medium of exchange, often created for specific events, contexts, or time periods, that facilitates transactions without serving as a permanent or widely recognized form of money.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348de914081909fc8edff56f34dbe |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:10 p.m.