Triple

T31652791
Position Surface form Disambiguated ID Type / Status
Subject West Shore side approach E807775 entity
Predicate instanceOf P0 FINISHED
Object roadway structure C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: roadway structure
Context triple: [West Shore side approach, instanceOf, roadway structure]
  • A. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. roadway approach
    A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
  • C. road segment
    A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
  • D. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • E. entidad de infraestructura vial
    Entidad de infraestructura vial es una organización pública o privada responsable de la planificación, construcción, operación, mantenimiento y gestión de las redes y servicios de transporte terrestre, como carreteras, puentes y túneles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348daf95c81908b4c985b7ddcd0b3 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 10:54 p.m.