Triple

T31610300
Position Surface form Disambiguated ID Type / Status
Subject T2-SE-A1 E806606 entity
Predicate instanceOf P0 FINISHED
Object tanker ship design C2334 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tanker ship design
Context triple: [T2-SE-A1, instanceOf, tanker ship design]
  • A. tanker chosen
    A tanker is a large, specialized vessel or vehicle designed for transporting bulk liquids or gases, such as oil, chemicals, or liquefied natural gas, over long distances.
  • B. concrete ship
    A concrete ship is a seafaring vessel whose hull is constructed from reinforced concrete instead of traditional materials like steel or wood.
  • C. cargo vessel
    A cargo vessel is a large ship designed to transport goods and materials across bodies of water, often over long international routes.
  • D. shipbuilder
    A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
  • E. naval ship
    A naval ship is a large, specially designed vessel operated by a nation's navy for military purposes such as defense, power projection, and maritime security.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348d61f2081908cad94bc9ffbb671 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 10:36 p.m.