Triple
T31584987
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dar al-Hadith |
E805932
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | religious educational building |
C950
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: religious educational building Context triple: [Dar al-Hadith, instanceOf, religious educational building]
-
A.
religious school
chosen
A religious school is an educational institution that integrates academic instruction with the teachings, practices, and values of a particular faith tradition.
-
B.
religious building
A religious building is a structure specifically designed and used for worship, rituals, and other activities associated with a particular faith or spiritual tradition.
-
C.
religious institute
A religious institute is an organized community within a faith tradition whose members publicly commit to a shared spiritual life, mission, and set of religious rules.
-
D.
religious auxiliary building
A religious auxiliary building is a secondary structure associated with a primary place of worship, used to support religious, administrative, educational, or community activities.
-
E.
religious building portfolio
A religious building portfolio is a curated collection of information, images, and documentation that showcases the design, history, and significance of one or more religious structures.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348d4891c8190b02bae3c8ecb68b7 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 10:25 p.m.