Triple
T31562570
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Philippsburg Nuclear Power Plant |
E805309
|
entity |
| Predicate | reactorNetCapacity_Philippsburg1 |
P135437
|
FINISHED |
| Object | 926 MW |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 926 MW | Statement: [Philippsburg Nuclear Power Plant, reactorNetCapacity_Philippsburg1, 926 MW]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: reactorNetCapacity_Philippsburg1 Context triple: [Philippsburg Nuclear Power Plant, reactorNetCapacity_Philippsburg1, 926 MW]
-
A.
electricalCapacityPerReactor_MWe
chosen
Indicates the electrical power output capacity, measured in megawatts electric (MWe), that is provided by each individual reactor.
-
B.
transmissionCapacity
Indicates the maximum amount of data or power that can be transmitted through a channel, link, or system over a given period.
-
C.
plannedCapacityMW
Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
-
D.
unitCapacity
Indicates the maximum quantity or load that a single unit is designed or allowed to hold, process, or accommodate.
-
E.
missionBayCapacity
Indicates the capacity or maximum volume that Mission Bay can hold or accommodate.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348d2ee94819091918d1789398c29 |
completed | April 30, 2026, 12:19 p.m. |
| NER | Named-entity recognition | batch_69f6a8055f8081908f635fe04654b5fe |
completed | May 3, 2026, 1:42 a.m. |
| PD | Predicate disambiguation | batch_69f6a75656e081908739ed9e2f600e42 |
completed | May 3, 2026, 1:39 a.m. |
Created at: April 30, 2026, 10:16 p.m.