Triple
T31556526
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | St Mary's Church, Douglas, Isle of Man |
E805142
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | church building in the Isle of Man |
C58998
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: church building in the Isle of Man Context triple: [St Mary's Church, Douglas, Isle of Man, instanceOf, church building in the Isle of Man]
-
A.
stone church building
A stone church building is a religious structure constructed primarily from stone, typically featuring architectural elements such as a nave, altar, and often a steeple or tower for worship and community gatherings.
-
B.
キリスト教会堂
キリスト教会堂は、キリスト教の礼拝や祈り、聖礼典、共同体活動が行われるために建てられた宗教建築物である。
-
C.
Historic church
A historic church is a long-standing religious building of significant architectural, cultural, and spiritual importance that reflects the beliefs, artistry, and community life of its era.
-
D.
Georgian church building
A Georgian church building is a Christian place of worship constructed or used during the Georgian era (1714–1830/37), typically characterized by balanced classical proportions, restrained ornamentation, and often brick or stone facades reflecting the architectural tastes of that period.
-
E.
Lutheran church building
A Lutheran church building is a Christian worship structure designed and used by a Lutheran congregation, typically featuring a simple, scripture-focused interior that reflects Lutheran theological and liturgical traditions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348d22e088190ad555d5bd42f9da0 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 10:13 p.m.