Triple

T31556076
Position Surface form Disambiguated ID Type / Status
Subject Port de l’Arsenal E805131 entity
Predicate instanceOf P0 FINISHED
Object port de plaisance C47239 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port de plaisance
Context triple: [Port de l’Arsenal, instanceOf, port de plaisance]
  • A. boat harbour chosen
    A boat harbour is a sheltered body of water equipped with facilities for mooring, servicing, and protecting boats and small ships.
  • B. boatyard
    A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
  • C. fishing port
    A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
  • D. wharves
    Wharves are structures built along a shoreline or projecting into a body of water where ships can dock to load and unload cargo or passengers.
  • E. river pier
    A river pier is a fixed or floating structure extending from the riverbank into the water, used for mooring boats, loading and unloading goods or passengers, and providing access to the river.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348d22e088190ad555d5bd42f9da0 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 10:13 p.m.