Triple

T31555799
Position Surface form Disambiguated ID Type / Status
Subject Innkreis Autobahn A8 – Suben border crossing E805123 entity
Predicate instanceOf P0 FINISHED
Object motorway border crossing C1133 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: motorway border crossing
Context triple: [Innkreis Autobahn A8 – Suben border crossing, instanceOf, motorway border crossing]
  • A. road border crossing chosen
    A road border crossing is a designated point along a roadway where vehicles and travelers legally pass between two jurisdictions or countries, typically featuring customs, immigration, and security controls.
  • B. road–rail border crossing
    A road–rail border crossing is a designated point at an international boundary where both road and railway transport routes intersect or pass through, enabling the controlled movement of vehicles, trains, goods, and passengers between neighboring countries.
  • C. border crossings network
    A border crossings network is a connected system of official entry and exit points, routes, and control infrastructures that manage and facilitate the movement of people, goods, and vehicles between neighboring jurisdictions.
  • D. rail border crossing
    A rail border crossing is a designated point where railway lines intersect an international boundary, enabling the controlled movement of trains, cargo, and passengers between countries.
  • E. international border crossing
    An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348d22e088190ad555d5bd42f9da0 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 10:13 p.m.