Triple
T31539811
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sallah Mohammed Faisel el-Kahir |
E804713
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | excavator |
C57544
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: excavator Context triple: [Sallah Mohammed Faisel el-Kahir, instanceOf, excavator]
-
A.
tunnel boring machine
A tunnel boring machine is a large, specialized mechanical device used to excavate tunnels through soil and rock by cutting, removing, and transporting material while simultaneously supporting the tunnel face.
-
B.
forklift
A forklift is an industrial vehicle equipped with a powered pronged platform used to lift, move, and stack heavy loads over short distances.
-
C.
crane
A crane is a large, tall machine equipped with hoists, cables, and pulleys used to lift and move heavy materials in construction, manufacturing, and shipping operations.
-
D.
specialized tractor
A specialized tractor is a purpose-built agricultural vehicle designed with specific attachments, power configurations, and structural features to efficiently perform particular farming tasks such as orchard work, vineyard cultivation, or hillside operations.
-
E.
dump truck
A dump truck is a heavy-duty vehicle with an open-box bed hinged at the rear, designed to transport and unload loose materials like sand, gravel, or demolition waste by lifting the front of the bed to dump its contents.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348d11a048190a65eb8384a3754ac |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 10:05 p.m.