Triple
T31521296
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Titlis Rotair cable car |
E804211
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rotating gondola lift |
C57541
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rotating gondola lift Context triple: [Titlis Rotair cable car, instanceOf, rotating gondola lift]
-
A.
Ferris wheel
A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
-
B.
roller coaster lift system
A roller coaster lift system is the mechanical assembly, typically using chains, cables, or linear motors, that raises coaster trains from the station to the initial peak to provide the potential energy needed for the ride.
-
C.
pressurized balloon gondola
A pressurized balloon gondola is an enclosed, pressure-controlled cabin suspended beneath a high-altitude balloon that protects occupants and equipment from low-pressure, low-temperature atmospheric conditions.
-
D.
urban gondola lift route
An urban gondola lift route is an aerial transit corridor within a city where cable-propelled cabins travel between stations to transport passengers above streets and obstacles.
-
E.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348cf839c81908657048402f7f97b |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 9:56 p.m.