Triple
T31519256
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pulaski Skyway |
E804159
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | highway viaduct |
C958
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: highway viaduct Context triple: [Pulaski Skyway, instanceOf, highway viaduct]
-
A.
highway bridge
chosen
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
B.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
C.
stone viaduct
A stone viaduct is a long, elevated structure composed of a series of stone arches or spans that carries a road or railway across a valley, river, or other low-lying terrain.
-
D.
urban bridge
An urban bridge is a man-made elevated structure that spans physical obstacles within a city, such as roads, railways, or waterways, to support the safe and efficient movement of vehicles, pedestrians, and utilities.
-
E.
ropeway
A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348cf839c81908657048402f7f97b |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 9:55 p.m.