Triple

T31485651
Position Surface form Disambiguated ID Type / Status
Subject SS-20 Saber E803268 entity
Predicate instanceOf P0 FINISHED
Object road-mobile ballistic missile C26571 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road-mobile ballistic missile
Context triple: [SS-20 Saber, instanceOf, road-mobile ballistic missile]
  • A. road-mobile missile system chosen
    A road-mobile missile system is a transportable weapons platform mounted on wheeled or tracked vehicles that can move, deploy, and launch missiles from various locations to enhance survivability and operational flexibility.
  • B. ballistic missile
    A ballistic missile is a guided projectile that is launched into a high, arching trajectory and primarily follows a ballistic path under gravity to deliver a warhead to a distant target.
  • C. surface-to-surface missile
    A surface-to-surface missile is a guided weapon launched from land or sea platforms designed to strike targets located on the Earth's surface.
  • D. land-attack missile
    A land-attack missile is a guided weapon system designed to strike targets on the ground from long or short range, typically using precision navigation and various warhead types.
  • E. long-range land-attack missile
    A long-range land-attack missile is a guided weapon system designed to strike fixed or relocatable targets deep inland from significant stand-off distances, typically launched from air, sea, or ground platforms.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348ca04508190ba9379b5329dfd75 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 9:35 p.m.