Triple

T31480498
Position Surface form Disambiguated ID Type / Status
Subject Burbo Bank Offshore Wind Farm E803124 entity
Predicate totalInstalledCapacityMW P53312 FINISHED
Object 90 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 90 | Statement: [Burbo Bank Offshore Wind Farm, totalInstalledCapacityMW, 90]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: totalInstalledCapacityMW
Context triple: [Burbo Bank Offshore Wind Farm, totalInstalledCapacityMW, 90]
  • A. totalElectricalCapacity_MWe chosen
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • B. plannedCapacityMW
    Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
  • C. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • D. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • E. solarPlantCapacity
    Indicates the maximum electrical power output that a solar power plant is designed or able to produce.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c9477c8190bc0a21f6d482d2fc completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69f7465687bc8190a9da44d62b634ed7 completed May 3, 2026, 12:57 p.m.
PD Predicate disambiguation batch_69f743f4ceb08190a21fe7f4a99b166b completed May 3, 2026, 12:47 p.m.
Created at: April 30, 2026, 9:32 p.m.