Triple

T31479140
Position Surface form Disambiguated ID Type / Status
Subject Luz y Fuerza del Centro E803087 entity
Predicate electricGridArea P196789 FINISHED
Object central interconnected system of Mexico LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: central interconnected system of Mexico | Statement: [Luz y Fuerza del Centro, electricGridArea, central interconnected system of Mexico]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electricGridArea
Context triple: [Luz y Fuerza del Centro, electricGridArea, central interconnected system of Mexico]
  • A. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • B. electricityMarketedBy
    Indicates that one entity is responsible for marketing, promoting, or selling electricity provided by another entity.
  • C. providesElectricityShare
    Indicates that one entity supplies a specified portion or share of electricity to another entity.
  • D. hasElectricalSubstation
    Indicates that one entity possesses, contains, or is served by an electrical substation associated with it.
  • E. electrificationCoverage
    Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c9477c8190bc0a21f6d482d2fc completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69fe68a4b67881909ca1d9f276f922e0 completed May 8, 2026, 10:50 p.m.
PD Predicate disambiguation batch_69fe680234c88190b01f953987b74972 completed May 8, 2026, 10:47 p.m.
PDg Predicate description generation batch_69fe68a385f48190b942700e3eddc9b6 completed May 8, 2026, 10:50 p.m.
Created at: April 30, 2026, 9:31 p.m.