Triple

T31436168
Position Surface form Disambiguated ID Type / Status
Subject Ratcliffe-on-Soar Power Station E801936 entity
Predicate generatingUnitCapacity P54646 FINISHED
Object 500 MW LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 500 MW | Statement: [Ratcliffe-on-Soar Power Station, generatingUnitCapacity, 500 MW]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: generatingUnitCapacity
Context triple: [Ratcliffe-on-Soar Power Station, generatingUnitCapacity, 500 MW]
  • A. plannedCapacityMW
    Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
  • B. grossElectricalCapacity_MWe chosen
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • C. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • D. generatingUnitCount
    Indicates the number of generating units associated with or involved in a given entity or context.
  • E. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c475348190bf579ca858eec77c completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69f6a916d2e08190bafc01cba73b6469 completed May 3, 2026, 1:47 a.m.
PD Predicate disambiguation batch_69f6a7548eb48190a69b60a3c6ad53b9 completed May 3, 2026, 1:39 a.m.
Created at: April 30, 2026, 9:01 p.m.