Triple

T31421411
Position Surface form Disambiguated ID Type / Status
Subject A7 north–south corridor E801539 entity
Predicate instanceOf P0 FINISHED
Object European motorway corridor C49884 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: European motorway corridor
Context triple: [A7 north–south corridor, instanceOf, European motorway corridor]
  • A. trans-European road
    A trans-European road is a major transportation route that crosses multiple European countries, facilitating international travel and trade across the continent.
  • B. trans-European transport network route chosen
    A trans-European transport network route is a designated corridor within the EU-wide integrated transport system that connects key cities, ports, and regions across Europe to facilitate efficient, interoperable, and sustainable cross-border movement of people and goods.
  • C. Polish expressway
    A Polish expressway is a high-capacity, limited-access road in Poland designed for fast regional and intercity traffic, typically featuring dual carriageways, grade-separated junctions, and controlled entry and exit points.
  • D. French autoroute
    A French autoroute is a high-speed, limited-access motorway in France designed for long-distance vehicular travel, often tolled and identified by an “A” followed by a number.
  • E. federal highway in Germany
    A federal highway in Germany is a major national road, designated with a "B" number, that connects cities and regions to support long-distance and high-capacity motor traffic under federal jurisdiction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c26f048190b4adadd71b4596c5 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 8:48 p.m.