Triple

T31410954
Position Surface form Disambiguated ID Type / Status
Subject Turner’s Falls Canal Company E801260 entity
Predicate waterpowerSource P191363 FINISHED
Object Connecticut River at Turners Falls NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Connecticut River at Turners Falls | Statement: [Turner’s Falls Canal Company, waterpowerSource, Connecticut River at Turners Falls]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: waterpowerSource
Context triple: [Turner’s Falls Canal Company, waterpowerSource, Connecticut River at Turners Falls]
  • A. hasHydropowerRoleIn
    Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
  • B. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • C. hydropowerProjectType
    Indicates the specific category or type of a hydropower project associated with an entity.
  • D. shareHydroelectricResource
    Indicates that multiple entities jointly use, manage, or benefit from the same hydroelectric power resource or facility.
  • E. isHydroelectricallyDeveloped
    Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c0dd648190bf2fd7642f78eb06 completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69fcdf2394748190b35cead3e208447d completed May 7, 2026, 6:51 p.m.
PD Predicate disambiguation batch_69fcdbe344ec8190a0471911952f4b82 completed May 7, 2026, 6:37 p.m.
PDg Predicate description generation batch_69fcdf22ab8881908b257f16522920c5 completed May 7, 2026, 6:51 p.m.
Created at: April 30, 2026, 8:38 p.m.