Triple
T31410954
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Turner’s Falls Canal Company |
E801260
|
entity |
| Predicate | waterpowerSource |
P191363
|
FINISHED |
| Object | Connecticut River at Turners Falls |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Connecticut River at Turners Falls | Statement: [Turner’s Falls Canal Company, waterpowerSource, Connecticut River at Turners Falls]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: waterpowerSource Context triple: [Turner’s Falls Canal Company, waterpowerSource, Connecticut River at Turners Falls]
-
A.
hasHydropowerRoleIn
Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
-
B.
hydropowerPotential
Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
-
C.
hydropowerProjectType
Indicates the specific category or type of a hydropower project associated with an entity.
-
D.
shareHydroelectricResource
Indicates that multiple entities jointly use, manage, or benefit from the same hydroelectric power resource or facility.
-
E.
isHydroelectricallyDeveloped
Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348c0dd648190bf2fd7642f78eb06 |
completed | April 30, 2026, 12:19 p.m. |
| NER | Named-entity recognition | batch_69fcdf2394748190b35cead3e208447d |
completed | May 7, 2026, 6:51 p.m. |
| PD | Predicate disambiguation | batch_69fcdbe344ec8190a0471911952f4b82 |
completed | May 7, 2026, 6:37 p.m. |
| PDg | Predicate description generation | batch_69fcdf22ab8881908b257f16522920c5 |
completed | May 7, 2026, 6:51 p.m. |
Created at: April 30, 2026, 8:38 p.m.