Triple
T31410934
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Turner’s Falls Canal Company |
E801260
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterpower company |
C58090
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterpower company Context triple: [Turner’s Falls Canal Company, instanceOf, waterpower company]
-
A.
hydropower authority
A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
-
B.
wind power company
A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
-
C.
water turbine
A water turbine is a device that converts the kinetic and potential energy of flowing or falling water into mechanical rotational energy, typically used to generate electricity.
-
D.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
-
E.
run-of-the-river hydroelectric power plant
A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348c0dd648190bf2fd7642f78eb06 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 8:38 p.m.