Triple

T31407283
Position Surface form Disambiguated ID Type / Status
Subject Helmand Valley Authority projects E801165 entity
Predicate instanceOf P0 FINISHED
Object irrigation and agricultural development program C26491 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: irrigation and agricultural development program
Context triple: [Helmand Valley Authority projects, instanceOf, irrigation and agricultural development program]
  • A. irrigated district
    An irrigated district is a geographically defined area where water is systematically supplied and managed, typically through infrastructure like canals and pipelines, to support agricultural production and related land uses.
  • B. agricultural project chosen
    An agricultural project is a planned initiative that organizes resources, activities, and technologies to produce, improve, or sustainably manage crops, livestock, or related agricultural outputs within a defined scope and timeframe.
  • C. irrigation command area
    An irrigation command area is the total land surface that can be supplied with water from a specific irrigation system or source under its designed operating conditions.
  • D. agricultural infrastructure
    Agricultural infrastructure comprises the physical and organizational systems—such as irrigation networks, storage facilities, transportation, and processing plants—that support the efficient production, handling, and distribution of agricultural goods.
  • E. heritage irrigation system
    A heritage irrigation system is a historically significant network of water management structures and practices preserved for their cultural, technological, and agricultural value.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c0dd648190bf2fd7642f78eb06 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 8:33 p.m.