Triple
T31367369
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Virus (app) |
E800048
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Biophilia app |
C58625
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Biophilia app Context triple: [Virus (app), instanceOf, Biophilia app]
-
A.
Biophilia app
chosen
A Biophilia app is a digital platform that helps users connect with nature—through guided outdoor activities, nature tracking, and personalized content—to support well-being and environmental awareness.
-
B.
botanical park
A botanical park is a curated outdoor space dedicated to the collection, cultivation, display, and conservation of diverse plant species for education, research, and public enjoyment.
-
C.
public garden feature
A public garden feature is a designed element within a shared outdoor space—such as fountains, sculptures, pathways, or plant displays—intended to enhance aesthetic appeal, usability, and community enjoyment.
-
D.
Gartenkunstwerk
A Gartenkunstwerk is a designed garden or landscape conceived as a unified work of art, where plants, structures, and spatial composition are intentionally arranged to create aesthetic, cultural, and experiential meaning.
-
E.
botanical garden facility
A botanical garden facility is a managed space dedicated to the collection, cultivation, display, and conservation of diverse plant species for education, research, and public enjoyment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224e6b7448190ac6bf97ad7364160 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:18 p.m.