Triple
T31365084
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hells Canyon Reservoir |
E799985
|
entity |
| Predicate | isPartOfHydroelectricComplex |
P15311
|
FINISHED |
| Object | Hells Canyon Complex |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hells Canyon Complex | Statement: [Hells Canyon Reservoir, isPartOfHydroelectricComplex, Hells Canyon Complex]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isPartOfHydroelectricComplex Context triple: [Hells Canyon Reservoir, isPartOfHydroelectricComplex, Hells Canyon Complex]
-
A.
hasHydropowerRoleIn
Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
-
B.
isHydroelectricallyDeveloped
Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
-
C.
hasHydroelectricProject
chosen
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
D.
isHydroelectricProjectOn
Indicates that a hydroelectric project is located on or situated along a specified water body or site.
-
E.
isInHydropowerCascade
Indicates that one hydropower facility is part of a sequential chain of hydropower plants along the same water system, where its operation is hydrologically or operationally linked to others in the cascade.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224e6b7448190ac6bf97ad7364160 |
completed | April 29, 2026, 3:33 p.m. |
| NER | Named-entity recognition | batch_69fe6c811bcc81908b1e1b1f8bcb071b |
completed | May 8, 2026, 11:06 p.m. |
| PD | Predicate disambiguation | batch_69fe6c026d5481908b7a814dcf38c183 |
completed | May 8, 2026, 11:04 p.m. |
Created at: April 29, 2026, 9:18 p.m.