Triple

T31349960
Position Surface form Disambiguated ID Type / Status
Subject Coliemore Harbour E799560 entity
Predicate instanceOf P0 FINISHED
Object boating harbour C47239 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: boating harbour
Context triple: [Coliemore Harbour, instanceOf, boating harbour]
  • A. boat harbour chosen
    A boat harbour is a sheltered body of water equipped with facilities for mooring, servicing, and protecting boats and small ships.
  • B. coastal harbour
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • C. boatyard
    A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
  • D. boathouse
    A boathouse is a waterside structure designed for storing, sheltering, and maintaining boats and related equipment, often providing direct access to a lake, river, or sea.
  • E. wharves
    Wharves are structures built along a shoreline or projecting into a body of water where ships can dock to load and unload cargo or passengers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224e51614819083141459a080e97c completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:17 p.m.