Triple

T31319199
Position Surface form Disambiguated ID Type / Status
Subject Tasqueña Metro station complex E798678 entity
Predicate electrificationOfConnectedTrolleybus P5320 FINISHED
Object overhead line LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: overhead line | Statement: [Tasqueña Metro station complex, electrificationOfConnectedTrolleybus, overhead line]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationOfConnectedTrolleybus
Context triple: [Tasqueña Metro station complex, electrificationOfConnectedTrolleybus, overhead line]
  • A. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • B. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • C. isElectrificationPlanned
    Indicates that there is an intention or scheduled plan to add or upgrade electrical infrastructure or services to the referenced entity or area.
  • D. usesElectricTraction
    Indicates that an entity operates or moves using electric traction as its primary means of propulsion or power transmission.
  • E. hasElectrificationStatus
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224e1932c81908fef14f7b03a10b7 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69fe610e1f6881908f10070ba64643cf completed May 8, 2026, 10:17 p.m.
PD Predicate disambiguation batch_69fe604c6c008190ad659e9b9fa82f7b completed May 8, 2026, 10:14 p.m.
Created at: April 29, 2026, 9:15 p.m.