Triple
T31281682
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pickering A |
E797686
|
entity |
| Predicate | shutdownReasonUnit3 |
P148357
|
FINISHED |
| Object | economic and technical considerations |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: economic and technical considerations | Statement: [Pickering A, shutdownReasonUnit3, economic and technical considerations]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: shutdownReasonUnit3 Context triple: [Pickering A, shutdownReasonUnit3, economic and technical considerations]
-
A.
shutdownAnnouncedOn
Indicates that an official announcement was made on a specific date or platform that a system, service, or operation will be shut down.
-
B.
shutdownCapability
Indicates the ability or permission for one entity to power off, deactivate, or terminate the operation of another entity or system.
-
C.
mainEngineShutdownCause
chosen
Indicates the reason or event that led to the shutdown of the main engine.
-
D.
shutdownPeriod
Indicates a time interval during which a system, service, or process is intentionally turned off or not operational.
-
E.
achievedColdShutdown
Indicates that a system, typically a nuclear reactor, has been brought to and maintained in a safe, fully shut down state with core temperatures low enough to prevent further fission or damage.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224def9088190a37034eab3daf57f |
completed | April 29, 2026, 3:33 p.m. |
| NER | Named-entity recognition | batch_69f6a0ea04888190ac3a813b603bcb5c |
completed | May 3, 2026, 1:12 a.m. |
| PD | Predicate disambiguation | batch_69f69fe463248190aa78128abeab1183 |
completed | May 3, 2026, 1:07 a.m. |
Created at: April 29, 2026, 9:13 p.m.