Triple

T31281682
Position Surface form Disambiguated ID Type / Status
Subject Pickering A E797686 entity
Predicate shutdownReasonUnit3 P148357 FINISHED
Object economic and technical considerations LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: economic and technical considerations | Statement: [Pickering A, shutdownReasonUnit3, economic and technical considerations]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: shutdownReasonUnit3
Context triple: [Pickering A, shutdownReasonUnit3, economic and technical considerations]
  • A. shutdownAnnouncedOn
    Indicates that an official announcement was made on a specific date or platform that a system, service, or operation will be shut down.
  • B. shutdownCapability
    Indicates the ability or permission for one entity to power off, deactivate, or terminate the operation of another entity or system.
  • C. mainEngineShutdownCause chosen
    Indicates the reason or event that led to the shutdown of the main engine.
  • D. shutdownPeriod
    Indicates a time interval during which a system, service, or process is intentionally turned off or not operational.
  • E. achievedColdShutdown
    Indicates that a system, typically a nuclear reactor, has been brought to and maintained in a safe, fully shut down state with core temperatures low enough to prevent further fission or damage.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224def9088190a37034eab3daf57f completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6a0ea04888190ac3a813b603bcb5c completed May 3, 2026, 1:12 a.m.
PD Predicate disambiguation batch_69f69fe463248190aa78128abeab1183 completed May 3, 2026, 1:07 a.m.
Created at: April 29, 2026, 9:13 p.m.