Triple

T31281676
Position Surface form Disambiguated ID Type / Status
Subject Pickering A E797686 entity
Predicate netElectricalCapacityPerUnit_MWe P35295 FINISHED
Object approximately 515 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 515 | Statement: [Pickering A, netElectricalCapacityPerUnit_MWe, approximately 515]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: netElectricalCapacityPerUnit_MWe
Context triple: [Pickering A, netElectricalCapacityPerUnit_MWe, approximately 515]
  • A. netElectricalCapacity_MWe chosen
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • C. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • D. plannedCapacityMW
    Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
  • E. electricalCapacityPerReactor_MWe
    Indicates the electrical power output capacity, measured in megawatts electric (MWe), that is provided by each individual reactor.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224def9088190a37034eab3daf57f completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f69edbb7648190bd89c57e0932eac1 completed May 3, 2026, 1:03 a.m.
PD Predicate disambiguation batch_69f69d1bf8cc8190a78dfa5ab00daf3a completed May 3, 2026, 12:55 a.m.
Created at: April 29, 2026, 9:13 p.m.