Triple
T31281652
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pickering A |
E797686
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | nuclear power station section |
C27232
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: nuclear power station section Context triple: [Pickering A, instanceOf, nuclear power station section]
-
A.
nuclear power facility
chosen
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
-
B.
nuclear reactor
A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
-
C.
decommissioned nuclear reactor
A decommissioned nuclear reactor is a permanently shut-down nuclear facility that has been defueled, dismantled or secured, and placed under long-term monitoring and waste management to ensure ongoing safety and environmental protection.
-
D.
nuclear reactor project
A nuclear reactor project is a coordinated engineering and management effort to design, license, construct, operate, and eventually decommission a nuclear reactor facility for energy production, research, or other specialized applications.
-
E.
nuclear power generation fleet
A nuclear power generation fleet is a coordinated group of nuclear power plants and reactors managed collectively to produce electricity reliably, efficiently, and safely across a power system or region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224def9088190a37034eab3daf57f |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:13 p.m.