Triple
T31255141
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Puketutu Island |
E796940
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tuff ring volcano |
C38004
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tuff ring volcano Context triple: [Puketutu Island, instanceOf, tuff ring volcano]
-
A.
tuff cone
chosen
A tuff cone is a steep-sided, relatively small volcanic landform built primarily from compacted volcanic ash and fragmented material explosively erupted in shallow water or wet environments.
-
B.
andesitic volcano
An andesitic volcano is a volcanic landform primarily composed of andesite lava, typically exhibiting intermediate explosivity and forming steep-sided stratovolcanoes common at convergent plate boundaries.
-
C.
twin-peaked volcano
A twin-peaked volcano is a volcanic landform characterized by two prominent summits or craters rising from a shared base, formed by dual vents or differential erosion of a single volcanic structure.
-
D.
volcanic complex
A volcanic complex is a geologic feature consisting of multiple related volcanic centers and associated deposits that have formed over an extended period of eruptive activity.
-
E.
lava dome
A lava dome is a steep-sided, mound-shaped volcanic feature formed by the slow extrusion of highly viscous lava that piles up near a volcanic vent.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224dd5fdc81908a4cd24917b67668 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:12 p.m.