Triple

T31242031
Position Surface form Disambiguated ID Type / Status
Subject Silkwood v. Kerr-McGee Corp. E796586 entity
Predicate instanceOf P0 FINISHED
Object nuclear regulation case C1313 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear regulation case
Context triple: [Silkwood v. Kerr-McGee Corp., instanceOf, nuclear regulation case]
  • A. nuclear energy law chosen
    Nuclear energy law is the body of legal rules, regulations, and international agreements that govern the safe, secure, and peaceful use, regulation, and oversight of nuclear materials, facilities, and activities.
  • B. nuclear energy event
    A nuclear energy event is an occurrence or process in which energy is released, transformed, or managed through nuclear reactions or radioactive decay, often involving reactors, fuel cycles, or radiation-emitting incidents.
  • C. Nuclear Regulatory Commission regional office
    A Nuclear Regulatory Commission regional office is a decentralized branch of the NRC responsible for overseeing, inspecting, and enforcing nuclear safety and regulatory compliance within a specific geographic area.
  • D. NRC operating license
    An NRC operating license is a formal authorization issued by the U.S. Nuclear Regulatory Commission permitting a facility or entity to operate a nuclear reactor or related nuclear activity under specified safety, security, and regulatory conditions.
  • E. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224db69ac81909a370adad6a7ac7c completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:11 p.m.