Triple

T31206234
Position Surface form Disambiguated ID Type / Status
Subject Main Group E795606 entity
Predicate instanceOf P0 FINISHED
Object campus core C27530 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: campus core
Context triple: [Main Group, instanceOf, campus core]
  • A. campus
    A campus is a defined area of land that houses the buildings, facilities, and open spaces of an educational institution, supporting academic, residential, and social activities.
  • B. campus axis
    A campus axis is a primary organizing line or pathway that structures the spatial layout, circulation, and visual relationships of buildings and open spaces across a campus.
  • C. shared campus
    A shared campus is a collaborative physical or virtual environment where multiple organizations, institutions, or groups co-locate and jointly use facilities, resources, and services to support learning, research, and community activities.
  • D. design campus
    A design campus is a dedicated educational and creative environment where students, faculty, and professionals collaborate across studios, labs, and shared spaces to explore, develop, and apply design thinking and practice.
  • E. campus mall chosen
    A campus mall is a central, often pedestrian-oriented outdoor or semi-outdoor space on a college or university campus that serves as a primary thoroughfare and social gathering area, typically lined with academic buildings, services, and green spaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224d8c6608190b7882466521f62be completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:09 p.m.