Triple
T31173363
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | a post-apocalyptic Boston |
E794673
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | imagined city |
C7344
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: imagined city Context triple: [a post-apocalyptic Boston, instanceOf, imagined city]
-
A.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
B.
fictional city
chosen
A fictional city is an imagined urban environment, complete with its own geography, culture, history, and social structures, created to serve as the setting for stories or speculative worlds.
-
C.
dream-city
A dream-city is an imagined urban landscape where surreal architecture, fluid geography, and symbolic spaces reflect the dreamer’s subconscious desires, fears, and memories.
-
D.
proto-city
A proto-city is an early, emergent urban settlement characterized by growing population density, rudimentary infrastructure, and nascent social, economic, and political organization that precedes a fully developed city.
-
E.
planet-wide city
A planet-wide city is a single, continuous urban settlement that covers an entire planet’s surface, integrating all infrastructure, governance, and population into one vast metropolitan system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224d5b9708190b6ca79ad2fd3a28a |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:07 p.m.