Triple

T3115433
Position Surface form Disambiguated ID Type / Status
Subject Chevrolet Express (facelifted variants) E65051 entity
Predicate instanceOf P0 FINISHED
Object passenger van C12244 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: passenger van
Context triple: [Chevrolet Express (facelifted variants), instanceOf, passenger van]
  • A. compact panel van
    A compact panel van is a small, boxy commercial vehicle with an enclosed cargo area and no rear side windows, designed primarily for urban deliveries and light-duty transport.
  • B. vehicle ferry
    A vehicle ferry is a boat or ship designed to transport cars, trucks, and other vehicles, along with their passengers, across bodies of water.
  • C. sport utility vehicle
    A sport utility vehicle is a versatile passenger vehicle that combines elements of on-road cars and off-road trucks, typically offering higher ground clearance, spacious interiors, and optional all-wheel or four-wheel drive for varied driving conditions.
  • D. compact MPV
    A compact MPV is a small, space-efficient multi-purpose vehicle designed to offer flexible seating and cargo configurations within a relatively short, city-friendly footprint.
  • E. full-size car
    A full-size car is a large passenger vehicle designed to offer spacious seating, ample trunk capacity, and a comfortable ride, typically serving as a family or executive sedan.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857fcc088190b0c4d45a5cde6f61 completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:04 p.m.