Triple
T31135801
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Frunzenskaya–Nyamiha interchange |
E793636
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | metro interchange |
C25595
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: metro interchange Context triple: [Frunzenskaya–Nyamiha interchange, instanceOf, metro interchange]
-
A.
railway–metro interchange
A railway–metro interchange is a transport facility where mainline railway services and urban metro lines connect, enabling passengers to transfer conveniently between regional and local rail networks.
-
B.
group of metro interchange stations
chosen
A group of metro interchange stations is a collection of transit hubs where multiple metro lines intersect, enabling passengers to transfer between routes within an urban rail network.
-
C.
metro train
A metro train is an electrically powered, multi-car rail vehicle designed to transport large numbers of passengers quickly and frequently along dedicated urban and suburban transit lines.
-
D.
metro operator
A metro operator is a person responsible for safely driving and controlling subway or metro trains according to schedules, signals, and operational procedures.
-
E.
underground metro station
An underground metro station is a subterranean transit facility where passengers access, board, and disembark metro trains via platforms connected to the surface by tunnels, stairs, escalators, and elevators.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224d2b3a48190aa9dd26fbf6eab1a |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:05 p.m.