Triple

T31133869
Position Surface form Disambiguated ID Type / Status
Subject Sony α7C E793584 entity
Predicate phaseDetectionAFPoints P88979 FINISHED
Object 693 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 693 | Statement: [Sony α7C, phaseDetectionAFPoints, 693]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: phaseDetectionAFPoints
Context triple: [Sony α7C, phaseDetectionAFPoints, 693]
  • A. afPoints
    Indicates a relationship where a scoring or point value is assigned, tracked, or associated with an entity or interaction.
  • B. phaseIndicatedBy
    Indicates that a particular phase or stage is determined, signaled, or specified by a given indicator or reference.
  • C. timingOfPoints
    Indicates the temporal relationship or sequence in which the points or events occur.
  • D. phaseCount
    Indicates the number of distinct phases or stages associated with a given process, event, or entity.
  • E. autofocusPoints chosen
    Indicates the relationship between a camera (or imaging device) and the specific focus points it can automatically select or use for focusing.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224d1701c819094f429798290e361 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6a0ea04888190ac3a813b603bcb5c completed May 3, 2026, 1:12 a.m.
PD Predicate disambiguation batch_69f69fe463248190aa78128abeab1183 completed May 3, 2026, 1:07 a.m.
Created at: April 29, 2026, 9:05 p.m.