Triple

T31119420
Position Surface form Disambiguated ID Type / Status
Subject Part 15 (The Financial Services Compensation Scheme) E793181 entity
Predicate conditionForCompensation P145160 FINISHED
Object failure of an authorised firm LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: failure of an authorised firm | Statement: [Part 15 (The Financial Services Compensation Scheme), conditionForCompensation, failure of an authorised firm]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: conditionForCompensation
Context triple: [Part 15 (The Financial Services Compensation Scheme), conditionForCompensation, failure of an authorised firm]
  • A. cancellationConditions
    Indicates the terms, requirements, or circumstances under which an agreement, service, or arrangement may be canceled.
  • B. compensationReason
    Indicates the reason or cause for which compensation is granted, requested, or applied between entities.
  • C. compensationTrigger chosen
    Indicates the event or condition that initiates or authorizes a compensation or payment to be made.
  • D. conditionForPayment
    Indicates the specific requirement or situation that must be satisfied before a payment is made.
  • E. conditionForReward
    Indicates that one situation, action, or state serves as the requirement that must be satisfied in order for a reward to be granted.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224d0a7688190af3fe3e6e26d01ed completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f69dfdda708190be290c7bec205445 completed May 3, 2026, 12:59 a.m.
PD Predicate disambiguation batch_69f69d1a37e081908d1d86b90ff502bd completed May 3, 2026, 12:55 a.m.
Created at: April 29, 2026, 9:04 p.m.