Triple

T31117619
Position Surface form Disambiguated ID Type / Status
Subject Fort McHenry Tunnel E793134 entity
Predicate instanceOf P0 FINISHED
Object immersed tube road tunnel C4139 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: immersed tube road tunnel
Context triple: [Fort McHenry Tunnel, instanceOf, immersed tube road tunnel]
  • A. road tunnel chosen
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • B. combined road and rail bridge–tunnel
    A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
  • C. bridge–tunnel complex
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • D. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • E. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224d0a7688190af3fe3e6e26d01ed completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 9:04 p.m.