Triple
T31095687
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Black pearl farms |
E792520
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | aquaculture operation |
C31105
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: aquaculture operation Context triple: [Black pearl farms, instanceOf, aquaculture operation]
-
A.
aquaculture facility
chosen
An aquaculture facility is a controlled environment where aquatic organisms such as fish, shellfish, and plants are bred, reared, and harvested for commercial, research, or conservation purposes.
-
B.
breeding operation
A breeding operation is an organized facility or enterprise that manages the controlled reproduction, care, and selection of animals or plants to produce offspring with desired traits.
-
C.
cultured fish
Cultured fish are aquatic animals raised under controlled conditions in managed environments such as ponds, tanks, or cages for purposes like food production, conservation, or research.
-
D.
aquarium system
An aquarium system is an integrated setup of tanks, equipment, and controls designed to create and maintain a stable, healthy aquatic environment for fish, plants, and other organisms.
-
E.
public aquarium
A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224cf157c81909e2d2bd88c9282c3 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:03 p.m.