Triple

T31092956
Position Surface form Disambiguated ID Type / Status
Subject Tomioka, Fukushima Prefecture E792439 entity
Predicate railServiceStatus P41715 FINISHED
Object Jōban Line service suspended after 2011 and later restored LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jōban Line service suspended after 2011 and later restored | Statement: [Tomioka, Fukushima Prefecture, railServiceStatus, Jōban Line service suspended after 2011 and later restored]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railServiceStatus
Context triple: [Tomioka, Fukushima Prefecture, railServiceStatus, Jōban Line service suspended after 2011 and later restored]
  • A. railStatus chosen
    Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
  • B. railLineStatusAfterward
    Indicates the condition or operational status of a rail line after a specified event or time period has occurred.
  • C. hasRailServiceAt
    Indicates that a rail transport service operates at or serves a particular location or facility.
  • D. followingTrainStatus
    Indicates that one entity is tracking or monitoring the current operational status or progress of a train.
  • E. blueLineStatus
    Indicates the operational or current state of a designated "blue line" (such as a transit, route, or service line).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224cf157c81909e2d2bd88c9282c3 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f697eabb048190bc01a830f14942c6 completed May 3, 2026, 12:33 a.m.
PD Predicate disambiguation batch_69f69664142c8190bc695501056b0236 completed May 3, 2026, 12:27 a.m.
Created at: April 29, 2026, 9:02 p.m.