Triple
T31078510
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coastal Surveillance System |
E792037
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | early-warning system |
C3917
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: early-warning system Context triple: [Coastal Surveillance System, instanceOf, early-warning system]
-
A.
early warning centre
An early warning centre is a facility or system that continuously monitors hazards, analyzes risk data, and issues timely alerts to help authorities and the public take preventive or protective action.
-
B.
public warning system
chosen
A public warning system is an organized infrastructure of technologies, protocols, and communication channels designed to rapidly alert and inform the public about imminent or ongoing emergencies and hazards.
-
C.
missile warning system
A missile warning system is a defense mechanism that detects, tracks, and alerts relevant entities to incoming missile threats to enable timely protective or countermeasure responses.
-
D.
SuperNova Early Warning System
A SuperNova Early Warning System is a monitoring and alert infrastructure that detects precursor signals of impending supernovae to provide timely warnings for scientific observation and potential impact mitigation.
-
E.
warning
A warning is a notification or signal indicating a potential problem, danger, or undesired outcome that may occur if no preventive action is taken.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224ccdbbc81909b0cdb4cc2d70c7a |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9:02 p.m.