Triple
T31049060
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 8th and I |
E791206
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Marine Corps barracks |
C27038
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Marine Corps barracks Context triple: [8th and I, instanceOf, Marine Corps barracks]
-
A.
Marine Corps base
chosen
A Marine Corps base is a military installation that provides facilities, training grounds, housing, and logistical support for United States Marine Corps personnel and operations.
-
B.
former military barracks
A former military barracks is a decommissioned facility that once housed and supported soldiers, now often repurposed for civilian, cultural, or commercial uses.
-
C.
military installation
A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
-
D.
former naval base
A former naval base is a decommissioned military maritime facility that once supported naval operations but has since been repurposed, abandoned, or converted to civilian use.
-
E.
naval training base
A naval training base is a dedicated military facility where naval personnel receive instruction, practice, and preparation in seamanship, warfare, and support operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224ca2fa881908a3ac5fedf207b90 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 9 p.m.