Triple

T31046103
Position Surface form Disambiguated ID Type / Status
Subject Glines Canyon Dam E791129 entity
Predicate removalSignificance P85880 FINISHED
Object key component of Elwha River ecosystem restoration LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: key component of Elwha River ecosystem restoration | Statement: [Glines Canyon Dam, removalSignificance, key component of Elwha River ecosystem restoration]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224ca2fa881908a3ac5fedf207b90 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6c3f834c481909c129c8739168d34 completed May 3, 2026, 3:41 a.m.
Created at: April 29, 2026, 8:59 p.m.