Triple

T31046101
Position Surface form Disambiguated ID Type / Status
Subject Glines Canyon Dam E791129 entity
Predicate impact P9 FINISHED
Object altered riverine and coastal ecosystems LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: altered riverine and coastal ecosystems | Statement: [Glines Canyon Dam, impact, altered riverine and coastal ecosystems]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224ca2fa881908a3ac5fedf207b90 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6953bafb88190a860e9c68a3dd4b2 completed May 3, 2026, 12:22 a.m.
Created at: April 29, 2026, 8:59 p.m.