Triple
T31036319
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vice Comando Generale |
E790861
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | struttura dell’Arma dei Carabinieri |
C12983
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: struttura dell’Arma dei Carabinieri Context triple: [Vice Comando Generale, instanceOf, struttura dell’Arma dei Carabinieri]
-
A.
military structure
A military structure is an organized framework of ranks, units, and command relationships that defines how armed forces are arranged, governed, and coordinated to conduct operations.
-
B.
military-security structure
A military-security structure is an organized system of forces, institutions, and mechanisms designed to protect a state or entity from external and internal threats through defense, intelligence, and enforcement capabilities.
-
C.
military administrative structure
chosen
A military administrative structure is the organized system of offices, roles, procedures, and chains of command that manage the planning, support, and governance of armed forces.
-
D.
civil-military coordination structure
A civil-military coordination structure is an organized framework that defines roles, processes, and communication channels between civilian authorities and military forces to plan, manage, and execute joint operations effectively and lawfully.
-
E.
public art structure
A public art structure is a designed, often site-specific physical installation placed in shared spaces to enhance aesthetic, cultural, or social experience for the general public.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c97a788190b5da1ead6038a74e |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:59 p.m.