Triple
T31032164
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Liberation Army (ELN) |
E790755
|
entity |
| Predicate | engagedInProcess |
P20759
|
FINISHED |
| Object | peace talks with the Colombian government |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: peace talks with the Colombian government | Statement: [National Liberation Army (ELN), engagedInProcess, peace talks with the Colombian government]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: engagedInProcess Context triple: [National Liberation Army (ELN), engagedInProcess, peace talks with the Colombian government]
-
A.
engagedOn
Indicates that two entities are committed to be married to each other as of a specific date or point in time.
-
B.
engaged
Indicates that two entities are formally committed to enter into a marriage or long-term partnership with each other.
-
C.
partOfProcess
Indicates that one event, step, or action occurs as a component or stage within a larger overall process.
-
D.
engagedBy
chosen
Indicates that an entity is actively involved, occupied, or participating in an activity, process, or interaction initiated or provided by another entity.
-
E.
isOngoing
Indicates that an action, process, or state is currently in progress and has not yet been completed or concluded.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c97a788190b5da1ead6038a74e |
completed | April 29, 2026, 3:33 p.m. |
| NER | Named-entity recognition | batch_69f694c2fe008190b643a2b2d8274669 |
completed | May 3, 2026, 12:20 a.m. |
| PD | Predicate disambiguation | batch_69f690f13d7481908ddfefe95df2a1c2 |
completed | May 3, 2026, 12:04 a.m. |
Created at: April 29, 2026, 8:59 p.m.