Triple
T31031790
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yongsan Park |
E790747
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned park |
C45055
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned park Context triple: [Yongsan Park, instanceOf, planned park]
-
A.
planned parade ground
A planned parade ground is a deliberately designed open space intended for organized public gatherings, ceremonial marches, and military or civic displays.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
парк
chosen
Парк — это общественное озеленённое пространство, предназначенное для отдыха, прогулок, развлечений и общения людей на открытом воздухе.
-
D.
planned national monument
A planned national monument is a proposed or officially designated site intended for future protection and commemoration due to its historical, cultural, or natural significance, but not yet fully established or developed.
-
E.
planned garden city
A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c97a788190b5da1ead6038a74e |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:59 p.m.