Triple

T31025027
Position Surface form Disambiguated ID Type / Status
Subject M-21 E790544 entity
Predicate launchControlSystem P115681 FINISHED
Object rear cockpit drone control instrumentation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: rear cockpit drone control instrumentation | Statement: [M-21, launchControlSystem, rear cockpit drone control instrumentation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: launchControlSystem
Context triple: [M-21, launchControlSystem, rear cockpit drone control instrumentation]
  • A. controlsSystem chosen
    Indicates that one entity has the authority or capability to direct, manage, or regulate the operation of a system.
  • B. requiresControlSystem
    Indicates that one entity depends on or mandates the presence of a control system associated with another entity in order to function or be valid.
  • C. controlStand
    Indicates that one entity manages, directs, or regulates the operation or behavior of another entity or system.
  • D. crewControls
    Indicates that a crew has authority over, manages, or directs the operation or behavior of another entity.
  • E. controlProtocol
    Indicates that one entity governs, regulates, or coordinates the behavior or operations of another according to a defined set of rules or procedures.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c811508190a7de096a5b1f5798 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6c8159edc8190b1c87015e0c820e8 completed May 3, 2026, 3:59 a.m.
PD Predicate disambiguation batch_69f6c3f42fbc8190a06eb1044c9e6094 completed May 3, 2026, 3:41 a.m.
Created at: April 29, 2026, 8:58 p.m.